otedsionbulb.com

Lamp installation specification

Update:30 Oct 2017
Summary:

Lighting inspection According to the packing list inven […]

Lighting inspection
According to the packing list inventory installation parts; pay attention to check the manufacturer's file technology is complete; check the appearance of the lamp is normal, with or without scraping, deformation, metal fall off, corrosion and so on.
Assembling lamps
In accordance with the installation instructions will be connected into one part of the whole, the length of the line within the lamp should be appropriate, multi-strand cord should be tin, should pay attention to uniform wiring color, easy to distinguish between the line of fire and zero line. Straighten the lights inside the line.
Lamp installation
Ordinary lamp holder installation: the power cord to stay after the maintenance of the length of the first cut off and cut off the thread, with the connection screw to the lamp holder installed in the junction box. Drop-off lamp installation: the power cord to retain the length of maintenance after the cut off the line and stripping the thread, the wire through the base of the lamp, with the connection screw to the base fixed on the junction box.
Power test run
After the installation of the lamp is completed, turn on the power and test whether the power is on.

http://www.outedsionbulb.com/

©2016 HAINING OUTE LIGHTING CO.,LTD All Rights Reserved.

Design By : HWAQ

INQUIRY&CONTACT

INQUIRY&CONTACT

  • address

    No.33,Hedong Street,Yuanhua Tow, Haining City,Zhejiang Province,China,314416

  • tel

    0086-573-87966035     0086-573-87865258

  • fax

    0086-573-87862035

  • e-mail

    director@outelighting.com